There is a moment on every refurbishment site that hardly anyone notices: when the old fit-out comes out and the skip is standing at the door. A great deal gets thrown away very quickly. Including material that is still perfectly fine.

In Soest, we did it differently.

The task

A sports car centre was refurbished. We installed several glass walls and office partitions there – on the ground floor and the first floor. In total, we were on site for fourteen days.

Standard glass is installed on the ground floor. That wasn't possible on the first floor: there, the walls border the open void to the hall, so the requirement for barrier glazing applies. This glazing sits in its own profile and needs its own glass. There is no room for compromise there, and that's how it should be.

Glass wall with black profiles and black-tinted glass in a car dealership showroom
One of the walls is in dark grey: black profiles, black-tinted glass.

What happened to the old glass

Glass surfaces were already installed in the existing building. Good material, cleanly made, just in the wrong place for the new layout.

We removed this glass, put it into storage – and reinstalled it in the new partitions.

That sounds simpler than it is. You need to know beforehand which pane goes where, because a pane of glass cannot be shortened. You have to work more carefully during removal than during demolition, because every edge counts. And the planning has to follow from that, not the other way round.

As a result, the client bought less new glass in the end, fewer deliveries were made, and less ended up in the skip.

Why we're telling this

Sustainability has become a big word in construction. We prefer the short sentence: Good glass doesn't belong in the skip if it still fits.

This doesn't work for every project. It needs an existing building with something to offer, and a client who is willing to go along with it. Where it's possible, we raise it.

And the quality?

In the end, what remains is what counts. On this site, there was almost nothing left to rework. No list that still needs weeks of follow-up work.

That is the standard we hold ourselves to.

Preparation is everything. If you know beforehand where every pane goes, you don't have to explain anything afterwards.

If you are facing a refurbishment and wondering whether the existing fit-out can still be used: talk to us. We'll take a look and tell you honestly what's possible and what isn't.

BackInnenausbau Wesseler – Made-to-measure solutions from BorkenEnquire about a glass wallContact us
© 2026 Innenausbau Wesseler · Owner Martin Wesseler, master joiner Legal notice · Privacy · Terms and Conditions · Investitionskompass